Point of contraflexure
|
| The point of contraflexure (PoC) occurs where bending is zero and at the point of change between positive and negative (or between compression and tension). |
In a beam that is flexing (or bending), the point where there is zero bending moment is called the point of contraflexure. At that point, the direction of bending changes its sign from positive to negative or from negative to positive. (It may also be thought of as a change from compression to tension or vice versa).
For this change to happen, it must pass through zero – the point of contraflexure. On a bending moment diagram, it is the point at which the bending moment curve intersects with the zero line.
An analogy may be made with a speeding train travelling west on a single track. In order to reverse direction and travel east, it must decelerate, stop then accelerate in the opposite direction. The point it stops, even if momentary, is zero – the neutral point, where it is not travelling.
Theoretically, when considering a structural member under load, such as a reinforced concrete beam, the point of zero bending moment would seem to suggest no reinforcement would be required. However, omitting reinforcement at that point is considered inadvisable as, in a real-life situation, it may be difficult to locate the exact point of contraflexure.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.


















